Question Tag: MIS Evaluation

Search 500 + past questions and counting.
  • Filter by Professional Bodies

  • Filter by Subject

  • Filter by Series

  • Filter by Topics

  • Filter by Levels

PM – Nov 2015 – L2 – Q7 – Performance Measurement Systems

Evaluate weaknesses in Stuck Ltd’s MIS and suggest improvements for enhanced strategic decision-making.

Stuck Ltd manufactures industrial glues and solvents in a single large factory. Approximately 400 different inputs are used to produce the 35 specialist outputs, which range from ultra-strong glues used in aircraft manufacture to high-impact adhesives for construction sites.

Two years ago, with the company only just breaking even, the directors recognized the need for more information to control the business. To assist them with their strategic control, they established a Management Information System (MIS). This system is now operational but provides only the following limited information to the directors via their networked computer system:

  1. A summary business plan for this and the next two years. The plan includes details of expected future incomes and expenditure on existing product lines. It was produced by a new member of the accounting department without reference to past production data.
  2. Inventory balances on individual items of raw materials, finished goods, etc. This report is highly detailed and comprises 80% of the output from the MIS itself.
  3. A summary of changes in total demand for glues and solvents in the market over the last five years. This information is presented as a numerical summary in six different sections, with each section taking up one computer screen, so only one section can be viewed at a time.

Required:

(a) Comment on the weaknesses in the information currently being provided to the directors of the company. (9 Marks)

(b) Suggest how the information may be improved, with particular reference to other outputs the MIS might usefully provide to the directors. (6 Marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "PM – Nov 2015 – L2 – Q7 – Performance Measurement Systems"

PM – Nov 2015 – L2 – Q7 – Performance Measurement Systems

Evaluate weaknesses in Stuck Ltd’s MIS and suggest improvements for enhanced strategic decision-making.

Stuck Ltd manufactures industrial glues and solvents in a single large factory. Approximately 400 different inputs are used to produce the 35 specialist outputs, which range from ultra-strong glues used in aircraft manufacture to high-impact adhesives for construction sites.

Two years ago, with the company only just breaking even, the directors recognized the need for more information to control the business. To assist them with their strategic control, they established a Management Information System (MIS). This system is now operational but provides only the following limited information to the directors via their networked computer system:

  1. A summary business plan for this and the next two years. The plan includes details of expected future incomes and expenditure on existing product lines. It was produced by a new member of the accounting department without reference to past production data.
  2. Inventory balances on individual items of raw materials, finished goods, etc. This report is highly detailed and comprises 80% of the output from the MIS itself.
  3. A summary of changes in total demand for glues and solvents in the market over the last five years. This information is presented as a numerical summary in six different sections, with each section taking up one computer screen, so only one section can be viewed at a time.

Required:

(a) Comment on the weaknesses in the information currently being provided to the directors of the company. (9 Marks)

(b) Suggest how the information may be improved, with particular reference to other outputs the MIS might usefully provide to the directors. (6 Marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "PM – Nov 2015 – L2 – Q7 – Performance Measurement Systems"

error: Content is protected !!
Oops!

This feature is only available in selected plans.

Click on the login button below to login if you’re already subscribed to a plan or click on the upgrade button below to upgrade your current plan.

If you’re not subscribed to a plan, click on the button below to choose a plan