- 10 Marks
MI – Mar-Jul 2020 – L1 – SB – Q2a – Costing Techniques
List the characteristics of a Just-In-Time (JIT) environment in manufacturing.
Question
The aim of the just-in-time system is to produce the required items with high quality and at the exact time required.
i. List FIVE characteristics of the just-in-time environment. (5 Marks)
ii. List FIVE benefits from the just-in-time system. (5 Marks)
Find Related Questions by Tags, levels, etc.
- Tags: Cost Management, Costing Techniques, Inventory Management, Just-in-Time, Lean Production
- Level: Level 1
- Topic: Costing Techniques
- Series: MAR/JULY 2020
Report an error