MI – May 2022 – L1 – SA – Q9 – Basic Variance Analysis

Calculating efficiency ratio based on labor hours.

XYZ manufacturing was able to achieve 95 percent of budgeted labour hours. If budgeted labour hours are 44,737 and standard hours produced is 42,075, what is the efficiency ratio?

A. 106%
B. 101%
C. 99%
D. 94%
E. 89%

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MI – May 2022 – L1 – SA – Q9 – Basic Variance Analysis"

MI – May 2024 – L1 – SA – Q7 – Costing Techniques

Tests understanding of the calculation method for efficiency ratios using standard and actual hours worked.

Which of the following control ratios is given by standard hours produced divided by actual hours worked? A. Activity ratio
B. Overhead efficiency ratio
C. Volume ratio
D. Capacity ratio
E. Efficiency ratio

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MI – May 2024 – L1 – SA – Q7 – Costing Techniques"

MA – Nov 2021 – L2 – Q3a – Standard Costing and Variance Analysis

Calculate and interpret the efficiency, capacity, and production volume ratios based on provided data.

a) GG Ltd is into fuel processing and transportation. GG Ltd produces three types of fuel, namely: Petrol, Diesel, and Pre-mix fuel.

The standard time for the production of the fuel types are:

  • Petrol: 50 minutes per metric tonne
  • Diesel: 30 minutes per metric tonne
  • Pre-mix fuel: 45 minutes per metric tonne.

The production budget for August is as follows:

  • Petrol: 42,000 metric tonnes
  • Diesel: 60,000 metric tonnes
  • Pre-mix fuel: 45,000 metric tonnes

The actual data for the month were as follows:

  • Labour: 100,000 hours
  • Production:
    • Petrol: 45,000 metric tonnes
    • Diesel: 50,000 metric tonnes
    • Pre-mix fuel: 40,000 metric tonnes.

Required:
Compute and interpret the following:
i) The efficiency ratio. (3 marks)
ii) The capacity ratio. (3 marks)
iii) The production volume or activity ratio. (4 marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MA – Nov 2021 – L2 – Q3a – Standard Costing and Variance Analysis"

MI – May 2022 – L1 – SA – Q9 – Basic Variance Analysis

Calculating efficiency ratio based on labor hours.

XYZ manufacturing was able to achieve 95 percent of budgeted labour hours. If budgeted labour hours are 44,737 and standard hours produced is 42,075, what is the efficiency ratio?

A. 106%
B. 101%
C. 99%
D. 94%
E. 89%

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MI – May 2022 – L1 – SA – Q9 – Basic Variance Analysis"

MI – May 2024 – L1 – SA – Q7 – Costing Techniques

Tests understanding of the calculation method for efficiency ratios using standard and actual hours worked.

Which of the following control ratios is given by standard hours produced divided by actual hours worked? A. Activity ratio
B. Overhead efficiency ratio
C. Volume ratio
D. Capacity ratio
E. Efficiency ratio

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MI – May 2024 – L1 – SA – Q7 – Costing Techniques"

MA – Nov 2021 – L2 – Q3a – Standard Costing and Variance Analysis

Calculate and interpret the efficiency, capacity, and production volume ratios based on provided data.

a) GG Ltd is into fuel processing and transportation. GG Ltd produces three types of fuel, namely: Petrol, Diesel, and Pre-mix fuel.

The standard time for the production of the fuel types are:

  • Petrol: 50 minutes per metric tonne
  • Diesel: 30 minutes per metric tonne
  • Pre-mix fuel: 45 minutes per metric tonne.

The production budget for August is as follows:

  • Petrol: 42,000 metric tonnes
  • Diesel: 60,000 metric tonnes
  • Pre-mix fuel: 45,000 metric tonnes

The actual data for the month were as follows:

  • Labour: 100,000 hours
  • Production:
    • Petrol: 45,000 metric tonnes
    • Diesel: 50,000 metric tonnes
    • Pre-mix fuel: 40,000 metric tonnes.

Required:
Compute and interpret the following:
i) The efficiency ratio. (3 marks)
ii) The capacity ratio. (3 marks)
iii) The production volume or activity ratio. (4 marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MA – Nov 2021 – L2 – Q3a – Standard Costing and Variance Analysis"

NBC Institute

Hello! How can I help you today?
Oops!

This feature is only available in selected plans.

Click on the login button below to login if you’re already subscribed to a plan or click on the upgrade button below to upgrade your current plan.

If you’re not subscribed to a plan, click on the button below to choose a plan