PM – Nov 2024 – L2 – Q1 – Decision-Making Techniques

Optimization of Oshimiri Nigeria Limited's production plan to maximize profits under resource constraints using linear programming.

Oshimiri Nigeria Limited, a company based in Aba, produces two grades of industrial vanish. The selling price and associated unit variable costs for vanish Grade A and Grade B are shown below:

Particulars Grade A Grade B
Selling Price N2,100 N1,500
Material X (N240/kg) N480 N240
Skilled Labour (N144/hr) N720 N288
Unskilled Labour (N60/hr) N120 N180
Variable Overhead (N84/machine hr) N168 N336

The fixed overhead costs are N2,600,000 per month. The company plans to maximize profits.

The availability of resources for the following month is as follows:

  • Material X: 25,000 Kg
  • Skilled Labour: 48,000 hours
  • Unskilled Labour: 39,000 hours
  • Machine hours: 50,000 hours

Required:

a. Identify the objective function and the constraints of the model to be used in determining the optimum production plan for the following month. (5 Marks)

b. Determine the optimum production plan for the month and the associated profit. (5 Marks)

c. Explain the concept and significance of dual prices and slack variables in the context of the model used by the company in this scenario. (4 Marks)

d. Calculate the dual prices for constraints identified in this scenario. (10 Marks)

e. Suggest ways in which the management can overcome the capacity constraints identified above during the month and the cost implications. (6 Marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "PM – Nov 2024 – L2 – Q1 – Decision-Making Techniques"

PM – Nov 2024 – L2 – Q1 – Decision-Making Techniques

Optimization of Oshimiri Nigeria Limited's production plan to maximize profits under resource constraints using linear programming.

Oshimiri Nigeria Limited, a company based in Aba, produces two grades of industrial vanish. The selling price and associated unit variable costs for vanish Grade A and Grade B are shown below:

Particulars Grade A Grade B
Selling Price N2,100 N1,500
Material X (N240/kg) N480 N240
Skilled Labour (N144/hr) N720 N288
Unskilled Labour (N60/hr) N120 N180
Variable Overhead (N84/machine hr) N168 N336

The fixed overhead costs are N2,600,000 per month. The company plans to maximize profits.

The availability of resources for the following month is as follows:

  • Material X: 25,000 Kg
  • Skilled Labour: 48,000 hours
  • Unskilled Labour: 39,000 hours
  • Machine hours: 50,000 hours

Required:

a. Identify the objective function and the constraints of the model to be used in determining the optimum production plan for the following month. (5 Marks)

b. Determine the optimum production plan for the month and the associated profit. (5 Marks)

c. Explain the concept and significance of dual prices and slack variables in the context of the model used by the company in this scenario. (4 Marks)

d. Calculate the dual prices for constraints identified in this scenario. (10 Marks)

e. Suggest ways in which the management can overcome the capacity constraints identified above during the month and the cost implications. (6 Marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "PM – Nov 2024 – L2 – Q1 – Decision-Making Techniques"

error: Content is protected !!
Oops!

This feature is only available in selected plans.

Click on the login button below to login if you’re already subscribed to a plan or click on the upgrade button below to upgrade your current plan.

If you’re not subscribed to a plan, click on the button below to choose a plan